The broken steps between Minster Way and Warminster Road have been replaced.
The poor state of the old concrete steps (pictured right) was pointed out to me a few years ago by a local resident. They had subsided and the concrete was breaking up. I requested that the council fix them, but knowing that it had taken two years to have St Christophers’ Close re-surfaced I wasn’t hopeful.
Today when I passed – and they are a little out of the way – I was pleasantly surprised to see the work done and the steps replaced.