British Waterways are to repair the banks of the canal upstream of Bathwick Hill.
The bank to the turning pool has been eroded and the towpath is now crumbling into the water. A very specific ‘hand-brake turn’ is required to turn a narrow boat on this section of the canal and it is often done incorrectly, resulting in damage to the bank.
Piling will be installed to protect the bank and allow the towpath to be rebuilt.